This blog is the twelfth in our series, “The ABCs of the AJP.”
Power lines, strung between high-voltage transmission towers, are etched across the American landscape. Yet the United States’ current transmission infrastructure is outdated and inefficient, plagued by bottlenecks and weak interconnections across regions, which limit the grid’s ability to integrate renewable generation and